The property comprises of an end of terrace industrial unit positioned at the front of the development. Access into the unit is through a reception doorway, or separately through a goods access off the adjacent car park. Construction is of steel portal frame with profiled metal clad exteriors with blockwork internal walls. Windows are double glazed and the sectional overhead loading doors are electrically operated.
The owners have had a mezzanine storage area, with staircase access, installed above the 19.7 sq m front office. The storage area has been designed to carry a load of 4.8 kN/m2. There is also a further light storage area above this, also with staircase access.